Forecast market settlement seems like an oracle problem, but it’s actually not. The real bottleneck lies in the early stage—how to design the contract. A well-designed contract can avoid most troubles; conversely, no matter how reliable the oracle is, it can't save the situation.
View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
28 Likes
Reward
28
10
Repost
Share
Comment
0/400
YieldHunter
· 2h ago
ngl, this is where most teams get it wrong. they're obsessing over oracle reliability when the real damage happens at contract architecture stage. seen too many protocols collapse because nobody bothered stress-testing edge cases in the settlement logic.
Reply0
NotFinancialAdviser
· 9h ago
That's so right. Contract design is the real ceiling; oracles are just a cover.
View OriginalReply0
RealYieldWizard
· 01-15 07:33
Exactly right, contract design is the real king, and oracles are just the scapegoats.
View OriginalReply0
ClassicDumpster
· 01-13 14:07
Contract design is indeed the underlying logic; oracles are just superficial articles.
View OriginalReply0
BearMarketMonk
· 01-13 14:06
That's right, this is a typical false demand argument. The contract design is poor, and no matter how awesome the oracle is, it's useless.
View OriginalReply0
GweiWatcher
· 01-13 14:00
You're absolutely right. I never thought of it from this perspective. I always thought it was the oracle's fault, but it turns out the design is the root cause.
View OriginalReply0
IfIWereOnChain
· 01-13 14:00
Really, contract design is the key. If it's not done well in the beginning, all the effort later will be in vain.
View OriginalReply0
just_another_wallet
· 01-13 13:59
Contract design is really underestimated. Everyone just thinks finding a reliable oracle is enough, but little do they know, there are already hidden pitfalls ahead.
View OriginalReply0
ProofOfNothing
· 01-13 13:46
Contract design is indeed the main part; oracles are just scapegoats.
View OriginalReply0
CryptoSourGrape
· 01-13 13:43
If I had known that contract design was so crucial, I wouldn't have been staring at the oracle every day. Now it's too late to regret.